Civil Vote Journal

Saturday, November 28, 2026Sign inSubscribe
COUNTY · ENVIRONMENT

Jacksonville mayor orders coal ash terminal to clear stockpile by January

Mayor Donna Deegan set a deadline after residents near the facility reported dust entering homes.

Civil Vote Journal County desk · November 28, 2026 5:24 PM EST

Jacksonville Mayor Donna Deegan ordered Keystone, a private waterfront terminal, to remove its coal ash stockpile by January 1. The order, issued November 17, also bars the terminal from accepting new coal ash deliveries and imposes daily fines up to $2,000. Deegan said the company lacked the local certificate required to handle solid waste.

Residents in nearby Talleyrand and Longbranch neighborhoods report dust from the coal ash piles, stored less than half a mile away, enters their homes and settles on vehicles. Pete Corbin, who lives two blocks from the terminal, said dust enters through his window air conditioner and believes it has worsened his and his wife's breathing problems. Keystone disputes that it needs the certificate, arguing its ash product does not fall under solid waste regulations.

The coal ash originates from a power plant in Puerto Rico and passes through Jacksonville on its way to Georgia's Chesser Island Landfill. More than 1 million tons passed through the city over five years. The U.S. Geological Survey notes that coal ash contains toxic elements including mercury, chromium, and arsenic.

Sources

Written from the reports above and checked three ways before publishing: every source link opens, an editor checked every claim, and every fact was matched word for word to a source. How our newsroom works · Report an error

Promise Watch

Ask Paige